Solar pile driver, using new type of hydraulic technology, convenient for hole transfer. The drilling machine structure is compact, while the mast has adjustable compensation function. When drilling, the mast supported on the ground, borehole stability is good. The machine hydraulic pressure can be adjusted according to different soil textures, so as to achieve the appropriate impact power for pile driving. It is a new type of pile driver.
Solar pile driver is mainly used in pile drilling for photovoltaic solar power station, pile drilling for highway guardrail, highway guardrail construction engineering construction, etc.
Technical Parameters
Solar Pile Driver Specifications
Impact frequency(bpm)
450--800
Impact(j)
1000
Work pressure(bar)
130---150
Once promotion(mm)
4100
Maximum ramming length(mm)
6000
Skid pitch(°)
95
Boom swing angle(°)
110
Boom pitch(°)
30°
Swinging angle of skid(°)
40 (left and right total 40)
Host power(KW)
84
Climb ability(°)
35
Dimension(L*W*H)(mm)
6240*2250*3000
Weight(Kg)
7350
Walk speed(km/h)
0--2.5
Frequently Asked Questions
1. How is the equipment transported?
We mainly transport machinery by ro-ro ship, bulk ship, or in standard containers and frame containers depending on the size and destination.
2. Are spare parts available for this equipment?
Yes, we can supply spare parts for all machines we sell. We have a professional spare parts department to ensure immediate supply when needed.
3. What are the optional transportation methods for trailers?
Optional transportation manners include RORO ship, bulk cargo ship, and 40' HQ containers to meet various logistical requirements.
4. Is customization available for logos and appearance?
Yes, we offer customized logo application and painting options according to specific customer requirements.
5. Can you handle special technical requirements?
Definitely. As a direct manufacturer with strong R&D capacity, we consider customer demands carefully and provide professional designed solutions.
6. What is the typical production lead time?
Common trailers usually take about 10 days to finish after order confirmation. Special equipment like oil tankers or custom trailers may take approximately 20 days.